End User : NAM
Location : Netherlands
Delivery : 1993/1994
Code : 93102, 94105, 95101, 95118

Key facts:
  • Natural Gas Injection (350 barg);
  • 2 Packages at Norg; 1 package at Grijpskerk;
  • Engineering, manufacturing/testing and site installation;
  • 2nd stage Centrifugal compressor (Man Turbo);
  • Driven by a siemens 40 MW VSDS;
  • Incl. lube oil-, sealgas- and anti-surge system;
  • Incl. DCS, safeguarding and monitoring system;
  • Full load & pressure closed loop test on site.

    Click HERE for a publication about the project.
    Published in Petrochem magazine, November 1997, number 11